The advent of rolling mill technology and its development during the first half of the nineteenth century also heralded in the industrial manufacture of tube and pipe. Initially, rolled strips of sheet were formed into a circular cross section by funnel arrangements or rolls, and then butt or lap welded in the same heat (forge welding process). Toward the end of the century, various processes became available for the manufacture of seamless tube and pipe, with production volumes rapidly increasing over a relatively short period. In spite of the application of other welding processes, the ongoing development and further improvement of the seamless techniques led to welded tube being almost completely pushed out of the market, with the result that seamless tube and pipe dominated until the Second World War. During the subsequent period, the results of research into welding technology led to an upturn in the fortunes of the welded tube, with burgeoning development work ensuing and wide propagation of numerous tube welding processes. Currently, around two thirds of steel tube production in the world are accounted for by welding processes. Of this figure, however, about one quarter takes the form of so-called large-diameter line pipe in size ranges outside those which are economically viable in seamless tube and pipe manufacturing. 

Steel Tube and Pipe Manufacturing Processes-7.jpg

Chart I provides an overview of the size ranges for seamless (DIN 2448) and welded (DIN 2458) tube. As is evident, welded tube is predominantly manufactured in ranges characterized by small wall thicknesses and large outside diameters, while seamless tube is produced mainly in the range extending from normal to very large wall thicknesses in the diameter range up to approx. 660 mm. The process of selection of the manufacturing process – especially in the overlap regions where there is a real choice between seamless and welded tube – is essentially dictated by the application of the tube, i.e. the associated material requirements and the service conditions. 

Steel Tube and Pipe Manufacturing Processes-6.jpg

Chart II provides a summary of the main manufacturing processes applied nowadays in the production of seamless and welded steel tube. Also indicated are the upstream production stages, any downstream further processing operations, and the typical products of the individual technologies. This scheme has been applied in order to illustrate the fact that a varying number of production stages in the starting material preparation or roughing stage are required to serve the various facilities of the tube production stage. 

Steel Tube and Pipe Manufacturing Processes-5.jpg

In the case of seamless tube and also in the case of the Fretz-Moon welding process, the production stage invariably involves a heating operation, in which case the product may also be referred to as hotformed tube or pipe. Downstream facilities for hot drawing or hot expanding occur relatively rarely; on the other hand, hot-formed tubes are extensively used as starting products for a downstream cold forming process. The latter is used in order to extend the product mix of a plant toward smaller diameters and wall thicknesses (DIN 2391), to reduce wall thickness and diameter tolerances, and to achieve special surface finishes or mechanical/thermo-mechanical properties in the tube. 

Steel Tube and Pipe Manufacturing Processes-4.jpg

The production of welded tube initially involves the continuous forming of strip, sheet or plate in roll stands (sometimes referred to as roller cages), or in presses (U-ing and O-ing; C-ing process). The strip may also be cold-formed on a three-roll bending machine and subsequently welded by pressure or fusion welding to produce the finished tube. Depending on the forming process, a distinction is made between longitudinally welded and spiral-welded tube; the latter may also be referred to as helical seam pipe.- 

Steel Tube and Pipe Manufacturing Processes-3.jpg

As the requirements imposed on tubular products continued to increase, not only were the associated manufacturing processes constantly improved, but also appropriate systems for effective production control and quality assurance were introduced. Nowadays, tube and pipe manufacturers of renown all have a system in place enabling the production process from the steelworks to the finished tube to be continuously monitored and documented for total traceability, and effectively controlled on the basis of quality criteria. The mechanical and nondestructive tests stipulated in the relevant technical specifications are carried out by personnel operating independently from the production control department so as to guarantee product of a constantly high quality.

Steel Tube and Pipe Manufacturing Processes-2.jpg

目錄:

Steel Tube and Pipe Manufacturing Processes-1.jpg

這本書主要供給做鋼管外貿的朋友們,是用來和老外吹牛的百科全書。


全書下載網址鋼管生產過程介紹全書(英文版)【下載】


(本平臺"常州精密鋼管博客網"的部分圖文來自網絡轉載,轉載目的在于傳遞更多技術信息。我們尊重原創,版權歸原作者所有,若未能找到作者和出處望請諒解,敬請聯系主編微信號:steel_tube,進行刪除或付稿費,多謝!)
搜索本站鋼鐵技術
★↓在此搜索查找鋼鐵材料知識↓★↘

互聯網 www.youwin2019.com


鋼鐵行業熱點文章推薦

常州精密鋼管博客網主辦單位:
常州仁成金屬制品有限公司 是 專業的 精密鋼管 生產廠家,汽車鋼管,電機殼鋼管 生產單位。


常州精密鋼管博客網推薦您訪問:

常州精密鋼管博客網
(常州仁成金屬鋼管制品生產廠家博客網站)
www.youwin2019.com?2006-2021
蘇ICP備08003692號

【關于本站】【提問】網站地圖【搜索】【知識星球】電腦端

主站蜘蛛池模板: 亚洲色欲久久久久综合网| av无码av无码专区| 欧美性猛交xxxx乱大交蜜桃| 老师脱了内裤让我进去| 国色天香精品一卡2卡3卡4| 超碰97资源站| 无码a级毛片免费视频内谢| 爱情岛论坛亚洲品质自拍hd| 国产成人一区二区三区在线观看| 小sao货揉揉你的奶真大电影| 少妇人妻无码精品视频| 国产美女高潮流白浆视频| 丁香五月缴情在线| 国产精品一区二区av交换| 亚洲综合欧美色五月俺也去| 久久婷婷五月综合国产尤物app| 2019亚洲午夜无码天堂| 人人狠狠综合久久亚洲| 大地影视mv高清视频在线观看| 国产三级片在线观看| 国产玉足榨精视频在线观看 | 久久香蕉超碰97国产精品| 99久久国产热无码精品免费| 国产手机在线αⅴ片无码观看| 久久精品人妻一区二区三区| 国产亚洲欧美日韩俺去了| 无码人妻精品丰满熟妇区| 狠狠色综合tv久久久久久| 精品久久久久久亚洲综合网| 丝袜足控一区二区三区| 久久精品国产亚洲av麻豆长发| 99精品国产综合久久久久五月天| 亚洲熟女乱综合一区二区| 亚洲av无码片在线观看| 伊人色综合一区二区三区| 国产色精品vr一区二区| 99久久精品费精品国产一区二 | 日韩一区二区三区精品| 人与动人物a级毛片在线| 午夜亚洲www湿好爽| 99精品视频九九精品视频|